Predicted Dave Reply

Draft — not Dave’s actual words
Rachel, on slide 21, change the operator-console description from fabrication to integration. Our price assumes ForgeFX will integrate and configure the selected controls and displays, not design and manufacture a custom console.

On slide 39, move installation, commissioning, training, and handover to months 11–12. That work can overlap contingency and defect closure, with the release candidate delivered at the end of month 10.

The revised environment-development language on slide 24 resolves that concern.