Leadership meeting / five-slide source

My Last Four Weeks

A simpler, concrete presentation about work completed from June 17 through July 15.

Presenter Slides English Short 1 source
Slide 01 / June 17–July 15

What I’ve Been Working On

  • Metro rail proposal
  • Reusable pricing tools
  • AI in everyday work
Light-rail controls, a proposal worksheet, and an AI work screen on a real project desk.
Slide 02

Metro Rail Proposal

  • Wrote the first scope table
  • Built three price levels
  • Made a working rail demo
A working light-rail cab simulator beside a simple three-column scope comparison.
Slide 03

Pricing Tools We Can Reuse

  • Cleaner cost tables
  • Clear scope at each price
  • Reused for the EROC proposal
A reusable three-column pricing worksheet photographed from above.
Slide 04

AI in the Actual Workflow

  • Put AdamoBot online
  • Built a production dashboard
  • Used AI on real proposals
A person using AI alongside a production schedule and a real proposal draft.
Slide 05

What This Added Up To

  • Faster proposal drafts
  • Clearer choices for clients
  • More working examples

Next: finish Metro and EROC.

A proposal binder, a cost comparison sheet, and a working rail demo on a laptop.
Source grounding

Grounded in the July 7 Team Leads Meeting, July 7/9/14 Metro scope and pricing meetings, July 13 Proposal Team Review, and July 12–14 ForgeRail git history.