ForgeFX Simulations
Channel Context · Refreshed 2026-07-30

#outokumpu_proposals · C0B72HGD8TY

Outokumpu Proposal Context

A decision-ready memory of the active crane-operator training simulator proposal: current scope, pricing architecture, owners, unresolved decisions, source files, and the newest proposal visuals.

Active proposal assembly

The source material is strong enough. The current bottleneck is reconciliation: one controlling feature list, one unified cost table, and one final decision on whether the enterprise option belongs in the client package.

What Matters Now

The proposal is no longer waiting on discovery. It is waiting on a clean scope-and-price spine.

Control Point

One Unified Cost Table

Adam is rebuilding the workbook from the available scope inputs and assigning each feature to the correct option. Prior cost/scope tables are archival evidence, not controlling pricing.

OWNER · ADAM
Content Decision

Feature Titles + Descriptions

Sara will finalize feature and option pages once Greg confirms which language is authoritative. Proposal page 13 is the closest existing source for the standard feature-list structure.

OWNERS · GREG + SARA
Delivery Gate

Final Commercial Verification

Confirm final prices, deadline, recipient list, submission format, controller commitment, and whether Extra Large stays in the proposal before anything is sent.

GATE · HUMAN APPROVAL

Working Offer Architecture

These are Greg's current scope anchors. They are not approved final pricing.

01 · SMALL

Focused VR Pilot

$98K

One representative pickup, transport, and placement exercise; HBC Spectrum B controls; compact environment; Guided and Assessment modes.

03 · LARGE

Comprehensive Operator Simulator

≈ $500K

Broader plant footprint, higher fidelity, scenario variation, expanded curriculum, detailed reporting, and stop-condition judgment.

04 · EXTRA LARGE

Enterprise Training Platform

TBD

Additional attachments, crane configurations, facilities, workflows, records, analytics, deployment, LMS/reporting, and enterprise reuse.

Proposal Package

The intended package is compact and specific, not boilerplate-heavy.

Project overview sourceCreative brief v003 is the current internal source; v002 was already sent to the prospect.
Client-informed workflowCoil identification, grab alignment, engagement, travel planning, hazards, swing control, horn use, and precision placement.
Controller targetHBC-radiomatic Spectrum B physical belly box; wireless integration is preferred but still requires feasibility confirmation.
Visual setPortrait executive summary plus Proposal 03, 04, and 05 imagery are available for the deck.
!
Option pagesFinish after Greg confirms the controlling feature titles, descriptions, and option boundaries.
!
Unified price tableFinish and verify one workbook; archive all superseded variants.
!
Enterprise-option decisionKeep Extra Large in the client package or move it to future-roadmap language.
!
Delivery verificationConfirm deadline, submission method, recipients, and final approved version.

Newest Proposal Visuals

Slack-hosted originals copied into this review page so they render reliably.

Scope + Cost Reconciliation Evidence

These screenshots explain why consolidation is needed. They are inputs, not approved outputs.

Working option summary
Working option summary
Standard option table format
Standard option format
Client-specific non-boilerplate content
Client-specific scope content
Competing feature list source
Competing feature list
Option scope source
Option scope source
Extra Large or grandpa bear option
Extra Large scope source
Renamed cost table evidence
Workbook rename evidence
Archive and consolidation evidence
Archive + consolidate

Source Library

Slack and internal-system links may require ForgeFX authentication.

Expanded review image